Board index Theme Park Discussions Theme Park News & Construction! Python at Efteling to be Retracked for 2018!

Python at Efteling to be Retracked for 2018!

Theme Park Construction And News Forum


Posts: 255
Points on hand: 4,433.00 Points
Location: in line for UNTAMED
Paradox wrote:
The queue and station are being rebuilt as well

Image


It's clear that the Boarding Pass will return when you see this picture: The line is straight on, with the Single Rider Line next to it.
Can't wait to try this thing out in May
Last edited by RCT3andNL2stuff on March 20th, 2018, 6:57 am, edited 1 time in total.
*Likes Taron, Untamed, Troy and Colorado Adventure a lot*


Posts: 255
Points on hand: 4,433.00 Points
Location: in line for UNTAMED
First testrun!





Looks like they made the lift a bit faster
I'm not sure though


Last edited by RCT3andNL2stuff on March 20th, 2018, 12:14 pm, edited 1 time in total.
*Likes Taron, Untamed, Troy and Colorado Adventure a lot*


Posts: 1820
Points on hand: 5,394.00 Points
Bank: 1,660.00 Points
Wow, I???d really like to see a comparison video of the coaster!

This looks incredible!
Oh, were you expecting something here?


Posts: 8144
Points on hand: 13,491.00 Points
I have to comment those supports remind me of the RCT3 "steelworx" construction parts - wow! :D
-- I was happy to be with NL1 - [:')] --

Dirk_Ermen User avatar
True Addicts
True Addicts

Posts: 13387
Points on hand: 2,175.50 Points
Bank: 45,000.00 Points
Location: Noord-Brabant, Netherlands
It really looks like that airtime after the loops has been completely nulled. Now the only bit left is the backseat on the first drop.
Coastercount: 1410 (I've seen the world and it's horrid contraptions... @.@)
- Wood: 142
- Steel: 1268

Coasterkidmwm User avatar
True Addicts
True Addicts

Posts: 12284
Points on hand: 8,049.10 Points
Bank: 15,000.00 Points
Location: Illinois, USA
Dirk_Ermen wrote:
It really looks like that airtime after the loops has been completely nulled. Now the only bit left is the backseat on the first drop.


I'm not too surprised by that since the Arrow air hills were always rather abrupt.
"Careful man, there's a beverage here!"


Posts: 255
Points on hand: 4,433.00 Points
Location: in line for UNTAMED
Progress has been made on the queue line.
It looks like that there will be music poles/boxes in the queue, could this mean that the Python theme finally will be used in the park?




Also, some areas have opened up
Attachments
Python Queue.jpeg
Picture: Eftelwesley
*Likes Taron, Untamed, Troy and Colorado Adventure a lot*

Coasterkidmwm User avatar
True Addicts
True Addicts

Posts: 12284
Points on hand: 8,049.10 Points
Bank: 15,000.00 Points
Location: Illinois, USA
I'm still really intrigued to see how this goes.
"Careful man, there's a beverage here!"


Posts: 255
Points on hand: 4,433.00 Points
Location: in line for UNTAMED
The ride reopened today!

First onride!


From 1 April ;-)

The Efteling also starts today with selling Python merch and bolts from the old supports (UPDATE: The bolts are sold out)
*Likes Taron, Untamed, Troy and Colorado Adventure a lot*


Posts: 255
Points on hand: 4,433.00 Points
Location: in line for UNTAMED
rcking04 wrote:
Wow, I???d really like to see a comparison video of the coaster!

This looks incredible!


I've just compared the old and the new Python onride from the park.
-It's smoother now
-It's a bit faster
-The lift is definitely faster
*Likes Taron, Untamed, Troy and Colorado Adventure a lot*

mkingy User avatar
Moderator
Moderator

Posts: 5463
Points on hand: 28,053.00 Points
Bank: 0.00 Points
Location: United Kingdom
Looks like they've done a decent job all things considered!
Coaster Count - 198
France 2019 Mini Trip Report

herman116 User avatar
Premium Member
Premium Member

Posts: 636
Points on hand: 7,471.00 Points
Location: The Netherlands
RCT3andNL2stuff wrote:
rcking04 wrote:
Wow, I???d really like to see a comparison video of the coaster!

This looks incredible!


I've just compared the old and the new Python onride from the park.
-It's smoother now
-It's a bit faster
-The lift is definitely faster


If I'm correct, the liftspeed already always was faster when there was just one train running on the track. Just so that with a two train operation they had a bit more time to fill the train at the station without letting the people wait at the brakes.

The trains needed some slight adjustments. One train was running today. The other train still had to be adjusted.

The ride was indeed smoother. The only thing I found weird was that the transition between the first and second corkscrew felt like it had a bit of a bump... But maybe that's just me since I've only ridden it once today.

Dirk_Ermen User avatar
True Addicts
True Addicts

Posts: 13387
Points on hand: 2,175.50 Points
Bank: 45,000.00 Points
Location: Noord-Brabant, Netherlands
I wouldn't be surprised if you are right. When looking at the video it feels like the corkscrews have a continuous roll issue. :lol: As the rotation speed constantly changes throughout both corkscrews. I'll probably find it out myself anytime soon. :)
Coastercount: 1410 (I've seen the world and it's horrid contraptions... @.@)
- Wood: 142
- Steel: 1268


Posts: 8144
Points on hand: 13,491.00 Points
WOW beautiful! Impressed with the "plastic toyish but solid" trackwork! :D
-- I was happy to be with NL1 - [:')] --

Previous

Return to Theme Park News & Construction!

 


  • Related topics
    Replies
    Views
    Last post